- Remove the engine from the engine stand.
- Install the flywheel. Refer to
Engine Flywheel Replacement.
- Install the engine to the vehicle.
Notice: Refer to Fastener Notice in the Preface section.
- Install the upper transaxle-to-engine bolts (3, 4, 5) and the stud (2).
Tighten
Tighten the bolts (3, 4, 5) and the stud (2) to 75 N·m (55 lb ft).
- Remove the engine lifting device.
- Install the radiator inlet hose to the engine. Refer to
Radiator Inlet Hose Replacement.
- Install the battery ground to the rear of engine.
- Install the fuel lines to the fuel rail. Refer to
Fuel Injector and Fuel Rail Replacement.
- Install the brake booster vacuum hose to the upper intake manifold.
- Install the vacuum hoses to the upper intake manifold.
- Install the engine coolant thermostat housing to the engine. Refer to
Engine Coolant Thermostat Housing Replacement.
- Raise the vehicle and remove the transaxle support.
- Install the radiator outlet hose to the engine. Refer to
Radiator Outlet Hose Replacement.
- Install the lower transaxle-to-engine bolt (6) and the stud (1).
Tighten
Tighten the bolt (6) and the stud (1) to 75 N·m (55 lb ft).
- Position the transaxle to oil pan brace and install the bolts.
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the engine mount bracket. Refer to
Engine Mount Bracket Replacement - Right Side.
- Install the torque converter bolts.
- Install the power steering pump. Refer to
Power Steering Pump Replacement.
- Install the A/C compressor. Refer to
Air Conditioning Compressor Replacement.
- Install the starter motor. Refer to
Starter Motor Replacement.
- Install the torque converter covers.
- Install the engine mount lower bolts (2).
Tighten
Tighten the bolts to 50 N·m (38 lb ft).
- Install the engine wiring harness grounds to the transaxle.
- Install the engine wiring harness ground nut to the transaxle stud.
Tighten
Tighten the nut to 35 N·m (26 lb ft).
- Install the catalytic converters. Refer to
Catalytic Converter Replacement - Left Side and
Catalytic Converter Replacement - Right Side.
- Lower the vehicle.
- Connect the following electrical connectors:
• | The body wiring harness-to-engine harness |
• | The electronic throttle control |
- Connect the coolant temperature sensor (1).
- Connect the A/C compressor (1).
- Connect the front and rear ignition coils (2).
- Connect the EVAP canister purge solenoid (2).
- Connect the MAP sensor (1).
- Connect the CMP sensor (1-8), then re-position the plastic wire loom/shield on each valve cover.
- Connect the rear KS (1).
- Connect the front KS (2) and the crank sensor. Refer to
Crankshaft Position Sensor Replacement.
- Install the drive belt and engine mount scrubber. Refer to
Drive Belt Replacement.
- Install the hood. Refer to
Hood Replacement.
- Install the air cleaner assembly. Refer to
Air Cleaner Assembly Replacement.
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection.
- Fill the crankcase with engine oil. Refer to
Engine Oil and Oil Filter Replacement.
- Fill cooling system. Refer to
Cooling System Draining and Filling.
- Perform a CKP system variation learn procedure. Refer to
Crankshaft Position System Variation Learn.
- Install the intake manifold cover. Refer to
Fuel Injector Sight Shield Replacement.
- Inspect for leaks.