- Install the rear brake lines into the vehicle.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Connect the front
brake line to the ABS module.
Tighten
Tighten the brake line fittings to 24 N·m (18 lb ft).
- Connect the brake line fitting at the left front brake hose inlet.
Tighten
Tighten the brake line fitting to 24 N·m (18 lb ft).
- Connect the brake line fitting below the ABS module.
Tighten
Tighten the brake line fitting to 24 N·m (18 lb ft).
- Insert the brake lines and close the brake line retaining clip below
the ABS module.
- Install the bracket for the brake lines to the left side fender
well with the bolt.
Tighten
Tighten the brake line bracket bolt to 8 N·m (71 lb in).
- Connect the upper and the lower oil cooler lines to the radiator.
Refer to
Engine Oil Cooler Hose/Pipe Replacement
in Engine Cooling.
- Install the evaporative emission canister and the support bracket.
Refer to
Evaporative Emission Canister Replacement
in Engine Controls.
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Connect the power steering pressure line to the power steering
pump. Refer to
Power Steering Hoses Replacement
in Power Steering System.
- Install the brake line bracket below the left side of the core support
with the bolt.
Tighten
Tighten the brake line bracket bolt to 8 N·m (71 lb in).
- Connect the front and rear brake line fittings at the core support.
Tighten
Tighten the brake line fittings to 24 N·m (18 lb ft).
- Install the brake line bracket below the right side of the core support
with the bolt.
Tighten
Tighten the brake line bracket bolt to 8 N·m (71 lb in).
- Install the front cover shield with the bolts.
Tighten
Tighten the front cover shield bolts to 35 N·m (26 lb ft).
- Install the lower half of the fan shroud. Refer to
Fan Shroud Replacement
in Engine Cooling.
- Lower the vehicle.
- Install the power steering lines and the return lines to the power
steering gear. Refer to
Steering Gear Replacement
in Power Steering System.
- Install the lower radiator hose to the radiator. Refer to
Radiator Hose Replacement
in Engine Cooling.
- Install the ABS harness connector near the right
side fender well.
- Insert the brake lines and close the retaining clip near the right
side fender well.
- Install the brake line bracket near the right side fender well with
the bolt.
Tighten
Tighten the brake line fittings to 8 N·m (71 lb in).
- Connect the front and the rear brake lines to the master cylinder.
Tighten
Tighten the brake line fittings to 24 N·m (18 lb ft).
- Install the top half of the fan shroud. Refer to
Fan Shroud Replacement
in Engine Cooling.
- Install the air cleaner cover.
- Connect the MAF and IAT sensor electrical connectors. Refer to IAT Sensor Replacement
in Engine Cooling.
- Refill the engine coolant. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Bleed the power steering. Refer to Bleeding the Power Steering
System in Power Steering System.
- Bleed the entire brake system. Refer to
Hydraulic Brake System Bleeding
in Hydraulic Brakes.